22.9.07 Another dark early Spring Saturday on Shelley Railway's Cudgewa branch.

Ta363 shunts an M wagon off the Dn Goods at Shelley



Dn Goods stopped at Beetoomba for safeworking.



M wagons placed at Cudgewa stock yard ready for loading.



Inward loading placed at Cudgewa goods shed.


Local VPC forester turns up with a last minute package.

Up Goods has been formed and awaits time to depart Cudgewa.


Departmental wagon over the pit at Cudgewa shed.

Up Goods transits The Needles into afternoon light.

Beetoomba stock race sees no traffic today.


The Up Goods crew take a moment at Shelley.

The M wagon looks on from the stock siding.